Kirkland Community College

This large scale addition added a new automotive shop, high-tech law enforcement equipment, modern lighting controls and several networked systems. 

 

 

Customer:  Integrity

Project Type: Public, Addition

Project Completion:  2022

Dennos Musuem Center, Traverse City 

 

The Dennos Musuem Project included an extensive track lighting system and lighting controls. Working in many different phases concurrently with an operating facility provided Isenhart Electric with the opportunity to prove our value at inconspicious installations.

 

Customer:  Spence Brothers

Project Type: Public, Remodel 

Project Completion:  2017

Ethanology, Elk Rapids 

 

Isenhart Electric performed the electrical work for a new distillery in Elk Rapids. The project was one we were proud of due to the customer wanting all of the conduit and boxes surface mounted. Essentially this means we can see our workmanship at all times, not just prior to being covered by wall coverings.

 

Customer:  Burdco, Inc.

Project Type: Public, New Construction

Project Completion:  2017

Midwest Tractor, Buckley 

 

This project was a design build and we were able to work closely with our client to ensure thier needs were captured and well-executed. Specific lighting requirements and welding stations, along with planning for future expansion, were just a few ways i.e. was able to deliever customer satisfaction.

 

Customer:  Midwest Tractor

Project Type: Private, Industrial

Project Completion:  2017

TBA Arnell Administration Building, Traverse City 

 

Isenhart Electric was awarded this $500,000 lighting and controls replacement project. We worked closely with the owners to complete the project with no disruption to students or faculty. This project presented many challenges but our open communication and relentless effort to provide a seamless turnover proved very valuable to our customer.

 

Customer:  Eckler Construction

Project Type: Public, Remodel

Project Completion:  2017

Versus Technology, Traverse City 

 

Isenhart Electric was awarded this $200,000 renovation. The short schedule and existing facility coupled with decorative lighting which is rarely utilized in most commercial buildings created challenges that were embraced by our company. We also installed many miles of cat 6 cabling and terminations for the use of Versus tracking systems.

 

Customer:  Burdco, Inc.

Project Type: Public

Project Completion:  2017

Lyric Theatre, Harbor Springs

 

This three-screen new movie theatre was completed in six months. There was much coordination with lighting controls and the theatre production company that was necessary for i.e. to facilitate the theatre opening on time. The project was a moving target and there were many changes that were made "on the fly" to produce a product that our client demanded.

 

Customer:  Ironwood Construction

Project Type: Private, Commercial

Project Completion:  2016

TBA Adult Work Center, Traverse City

 

This project was a $500,000 addition to TBA's existing facility. Masonry construction and routing of the new service lines from the existing facility were challenging but we did provide these services seamlessly. The project turned out to be very impressive, as well as on schedule and under budget.

 

Customer:  Grand Traverse Construction

Project Type: Public, Remodel

Project Completion:  2016

Bellaire Family Health Center, Bellaire

 

This 15,000 sq. foot medical facility included x-ray, pharmacy, mammography, and several exam rooms. There were multiple systems including a 150 KW emergency generator and 1-170 and 1-180 amp ATS. Upon project completion, Braun Construction provided a testimonial thanking us for a successful project.

 

Customer:  Braun Construction Group

Project Type: Medical

Project Completion:  2014

Blair Elementary, Traverse City

 

Isenhart Electric was awarded the addition to Blair Elementary school. The project was completed on time and under budget. We were asked to value engineer for cost savings to the school and saved the district thousands of dollars without impacting the electrical integrity or functionality of the design intent.

 

Customer:  Grand Traverse Construction

Project Type: Educational

Project Completion:  2014

FOX Motors BMW, Traverse City 

 

Isenhart Electric’s construction group was selected to provide construction services for the new BMW dealership for Fox Motors in Traverse City, MI.  The project required 6-8 field electricians at periods during the construction.  It was a masonry build out so ensuring our rough ins were located properly meant much coordination with engineers, owners, and other contractors.  The project was completed in 6 months.  At the conclusion, the engineering firm had praise for our crew and for how easy it was to work with us.  “We will recommend Isenhart Electric for future projects.”

 

Customer:  Comstock Construction

Project Type: Commercial, New Construction 

Project Completion:  June 2013

Lake Superior State University, Sault Ste. Marie

 

Isenhart Electric’s construction group was retained to perform a remodel of the Quarterdeck Dining Hall at Lake Superior State University.  The project was challenging due to the existing conditions and the additional servary areas being relocated to the current dining area.  We added a new 200 amp panel board under the dining area floor and we were able to conceal our wiring under the floor and within cabinetry that was added for the new kitchen equipment.     

 

Customer:  Triangle Associates Inc.

Project Type: Food Service, Remodel 

Project Completion:  August 2012

 

 

Bob Evans, Traverse City 

Isenhart Electric’s construction group was retained to perform a remodel of the Bob Evans Restaurant in Traverse City, MI.  The demanding schedule left little room for error and the project execution was extremely smooth from start to finish.  The restaurant was closed for a period of ten days.  Attitude is everything on a project schedule this demanding.  Every step of the way we found solutions for challenging and unforeseen problems.


Project type:  Commercial Remodel

Customer:  Wolgast Corp.

Project Completion: June 2012

 

GameStop, Cadillac

 

Isenhart Electric’s construction group was awarded a contract to perform the tenant fit out for Game Stop in Cadillac, MI.  This project was the first contract project performed by i.e. 

 

Customer: Titan North Amercia 

Project type:  Commercial Retail

Project Completion: March 2012 

Great Lakes Trim, Williamsburg

 

Isenhart Electric’s Service group was retained to perform a remodel of the Great Lakes Trim plant #1 in Williamsburg, MI.  This project added a catwalk, restrooms, new lighting, and power drops to equipment in the manufacturing facility.  Face to face communication with the President was the basis of design.  We were able to come up with solutions to problems on a napkin and a hand shake.  This project scope was ever changing but still came in under budget and on time.

 

Project type:  Industrial Remodel

Customer:  GLT

Project Completion: June 2012 

 

 

Central Michigan University, Mt. Pleasant 

 

Isenhart Electric’s construction group was retained to perform a remodel of Troutman Hall for the new Towers Medical Facility.  Performing a complete demolition of the existing electrical system and installing a new electrical system with redundant ground for all exam areas.  Indirect lighting was utilized to enhance the patient experience.  The latest lighting control technology ensured the space was up to date with the energy code.  The fire alarm system was also updated in the entire area.    

 

Project type:  Education Remodel

Customer:  Denali Construction.

Project Completion:  July 2012

 

State Savings Bank 

Print | Sitemap
© James Isenhart

This website was created using IONOS MyWebsite Pesonal.